CASE 9: Vertical Acting without Egress
Corridor Separation
As in the previous case study the requirements of the R-2 occupancy pertaining to corridor rating and vertical space allowance come into play.
![d200_st.timprep5a_72 | McKEON](https://www.mckeondoor.com/wp-content/uploads/2019/10/d200_st.timprep5a_72.jpg)
![d200_st.timprep5b_72 | McKEON](https://www.mckeondoor.com/wp-content/uploads/2019/10/d200_st.timprep5b_72.jpg)
![DoorDiagram_Vertical-Acting-No-Egress-Curtain | McKEON](https://www.mckeondoor.com/wp-content/uploads/2019/10/DoorDiagram_Vertical-Acting-No-Egress-Curtain-4.jpg)
As in the previous case study the requirements of the R-2 occupancy pertaining to corridor rating and vertical space allowance come into play.